Initial attempt at repair revealed cracks going down behind the frames |
Start of the big stripdown |
Removing the manifold |
Superheater elements unbolted ready for removal |
The big lift |
Loadiing old ashpan into hirevan at Carnforth. To be used as pattern for new one |
Unloading ashpan at Hopetown Works Darlington |
Descaling the outside ready for thickness and crack testing |
Lots of bits to be overhauled. Stored in a GUV |
Regulator removed. Injector steam pipes can be seen under lip |
Tube and flue ends slotted ready for knocking out |
Inside firebox without concrete arch |
Inside boiler facing front tubeplate. Longitudinal stays at top |
Facing firebox. Longitudinal, side, cross and roof stays can all be seen. Link stays removed. Feed trays bringing water from injectors prominent |
Recording the number of side stays that need replacing |
Cracks revealed in piece of removed plate |
Link stays replaced this year |
One of the new, copper, side stays |
Palm stays to support front of firebox throatplate |
Roof stay nuts when newly replaced in 2004 |
The ultimate adjustable spanner |
Roof stays when replaced in 2004 |
| |